Sunday, May 30, 2010

Floor Tiles and Garage Door


Got a call from my site supervisor. Final inspection will be approx w.c 15/6! Getting Excited now.
Already purchased the curtains, bedroom furniture and white-goods (they are holding them until we need them delivered).

Tiling will take about another 3 or 4 days to complete.
Carpet
Downpipes need to be installed.
Electrical, phone and antenna points need to be installed (cable is already in wall).
Painting touch ups to be done
Bathroom screens and toilets to be put in.

So depending on the inspection with the 3rd party building inspector, and all goes well, we could be in by end of June!!


Garage Door

No power to the door yet
Start of the tiles




Entrance tiles
My car before it got covered in mud

1 comment:

  1. These designs are really great I love this kind of blogs you give me such a nice things through this blog I like garage doors and windows designs very much.
    garage doors

    ReplyDelete